Business & IT

Peer-reviewed scientific journal · Czech Technical University in Prague

ISSN 1805-3777 (print)
ISSN 2570-7434 (online)

Business & IT · Vol. VII(1) · 2017

Case study: BIM protocol for Skanska (Czech Republic)

Patrik Kvirenc, Robert Bouska

Journal
Business & IT, Vol. VII(1), pp. 8–13
Year
2017
DOI
https://doi.org/10.14311/bit.2017.01.02

Abstract

The research paper introduces the problems of technical support of a model in projects in the area of BIM. Planning Requirements (BIM protocol) describe the technical preparedness of models, data repletion, information sharing, communications and other processes in construction projects. This BIM protocol was developed for Skanska Inc. It consists of several parts, which are described in the article. At the introduction Skanska Inc. is presented together with its position in the area of BIM in the Czech market. The research analyzed the document itself, including its annexes. Another section is devoted to the importance of BIM protocol in project management of company Skanska. The document was prepared in cooperation with Skanska Inc. It applies only to commercial and residential projects in the area of building construction.

Keywords

BIM (Building Informaton Modeling), BIM protocol, data structure, project management, model

Full text

Download PDF

How to cite (APA)

Patrik Kvirenc, Robert Bouska (2017). Case study: BIM protocol for Skanska (Czech Republic). Business & IT, Vol. VII(1), pp. 8–13. https://doi.org/10.14311/bit.2017.01.02

Editorial information: Business & IT, ISSN 2570-7434, Creative Commons licence CC BY 4.0, published by CTU in Prague, 2017. https://bit.fsv.cvut.cz/