Business & IT

Peer-reviewed scientific journal · Czech Technical University in Prague

ISSN 1805-3777 (print)
ISSN 2570-7434 (online)

Business & IT · Vol. IX(2) · 2019

Cost estimation using new rules of measurements 3 in BIM 360

Islam Mohammed Khalil

Journal
Business & IT, Vol. IX(2), pp. 18–28
Year
2019
DOI
https://doi.org/10.14311/bit.2019.02.02

Abstract

Cost estimates are prepared to different ends throughout the project lifecycle. Up front, the goal is to provide input for investment decisions. The cost estimate is used to determine the size of the required investment to create or modify assets and the elements of the building during the maintenance phase. The Paper examines The implementation of BIM 360 as a common data platform for construction workflows in cost estimation by connecting all the stakeholders and provide the ability to collaborate all stakeholders in a single platform which is containing information model proceeds throughout the life cycle of the construction work and ideally it contains all the information , issues, associated with elements in the model composition ,measuring and dividing the building into elements associated with its information were required to address the problems associated with the measurement of building construction works and future maintenance works using New Rules Of measurements 3, at maintenance stage depending on elemental method of a building project and estimate the costs accurately.

Keywords

Cost Estimation, BIM 360, New Rules of Measurements (NRM3), Maintenance

Full text

Download PDF

How to cite (APA)

Islam Mohammed Khalil (2019). Cost estimation using new rules of measurements 3 in BIM 360. Business & IT, Vol. IX(2), pp. 18–28. https://doi.org/10.14311/bit.2019.02.02

Editorial information: Business & IT, ISSN 2570-7434, Creative Commons licence CC BY 4.0, published by CTU in Prague, 2019. https://bit.fsv.cvut.cz/