Business & IT · Vol. XIV(2) · 2024
Financial Evaluation of the BIM Model Coordination Process in Construction
Abstract
Although the decision whether to use the BIM method for a project has many factors, the purpose of this work is to describe financial benefits that comes with using the method in the field of project coordination in design phase. On the following pages it will be described how the tools of the BIM method can be used to detect collisions in comparison to performing classical coordination only using 2D coordination and visual inspection. The cost of removing the collisions will be determined for the case in which it would not have been detected during the design phase, but the collision is dealt with during construction. The difference between BIM and classical detections will be determined as the added value of using BIM method.
Keywords
clash detection; digital information model; financial evaluation
Full text
How to cite (APA)
Daniel Kobik, Lubos Verny, Josef Zak (2024). Financial Evaluation of the BIM Model Coordination Process in Construction. Business & IT, Vol. XIV(2), pp. 117–126. https://doi.org/10.14311/bit.2024.02.11